Erhardt provided general contracting and construction management services for an industrial client’s cold storage facility.  

The project included an 85,000-square-foot freezer, 3,500 square feet of office space, an ammonia refrigeration room, a 12-position dock and 120 semi-trailer parking spaces.

The freezer was designed to be held at -10 degrees with 12,000 pallet position storage units. It features in-rack fire protection systems, heavily insulated walls and an in-ground heating system to prevent frost from disrupting the foundation.

In addition to leading the design-build team for the project, Erhardt self-performed work on the interior cooler panels, doors and hardware and other various tasks.

 

 

Erhardt provided general contracting and construction management services for an industrial client’s cold storage facility.  

The project included an 85,000-square-foot freezer, 3,500 square feet of office space, an ammonia refrigeration room, a 12-position dock and 120 semi-trailer parking spaces.

The freezer was designed to be held at -10 degrees with 12,000 pallet position storage units. It features in-rack fire protection systems, heavily insulated walls and an in-ground heating system to prevent frost from disrupting the foundation.

In addition to leading the design-build team for the project, Erhardt self-performed work on the interior cooler panels, doors and hardware and other various tasks.

 

Erhardt provided general contracting and construction management services for an industrial client’s cold storage facility.  

The project included an 85,000-square-foot freezer, 3,500 square feet of office space, an ammonia refrigeration room, a 12-position dock and 120 semi-trailer parking spaces.

The freezer was designed to be held at -10 degrees with 12,000 pallet position storage units. It features in-rack fire protection systems, heavily insulated walls and an in-ground heating system to prevent frost from disrupting the foundation.

In addition to leading the design-build team for the project, Erhardt self-performed work on the interior cooler panels, doors and hardware and other various tasks.